An error occurred while fetching folder content.

Konrad Mohrfeldt
authored
vue-full-calendar is not the official Vue package of fullcalendar, is only compatible with Vue 2.x, uses the outdated fullcalendar v3 library and contains a bunch of huge dependencies like jQuery and moment. The changes in this commit migrate the dashboard to fullcalendar v5 and the official vue component. Apart from that there have been a few refactors and fixes. These are: * remove irrelevant stub event callbacks * make view updates reactive instead of imperative (see removal of renderView method and introduction of renderWatcher) * rename methods to better reflect their purpose resolve → enterConflictMode resolveEvent → resolveConflict * emit events in modals instead of call to methods on this.$parent * let → const where applicable to prevent accidental reassignments * switch to for-of loops (from for-in) for better readability * fix some typos One other major change is that timeslot and collision data is no longer mixed with event data for fullcalendar and is assigned to the extendedProps property instead. As mentioned in fullcalendars documentation on event parsing [1], any data that fullcalendar does not handle on its own is moved into the extendedProps object with the explicit recommendation to put them there right from the start. We follow that recommendation. closes #94 [1] https://fullcalendar.io/docs/event-parsing
Name | Last commit | Last update |
---|